No capacity envelope has been measured. One workload has been, on a GitHub-hosted runner, and what it read is below: it describes that runner and not an installation. The rest of this page is the arithmetic a deployment can do before it runs anything, and the defaults it would be running with. None of it is a throughput claim, and all of it is here because the alternative is a reader assuming the defaults fit their scale.

What an installation needs before it can size itself is the same measurement against its own workload and nodes: latency, queue delay, API demand, CPU, memory, Pod count and retained growth, which is what issue #224 asked for. How to measure it is the tool for that. Until an installation has run it, treat what follows as the lower bound on cost rather than as a limit.

What a resource costs while nothing changes

Section titled “What a resource costs while nothing changes”

A resource that is converged still works. The operator re-reads it at spec.interval, and each pass runs the read-only operations its family needs. The interval runs from the start of one refresh to the start of the next. A refresh that takes longer than its interval starts the next one an interval after it ends, so a busy resource does not refresh back to back.

PtahSchema PtahMigration
Operations per refresh Resolve, Verify, Observe, Plan Resolve, Verify, History
Default spec.interval 10m 10m
Jobs per resource per day 576 432

Each of those is a Job, a Pod, an image pull against the node’s cache, a database connection for the operations that open one, and a result read from the Pod’s log. The numbers are cadence arithmetic: four operations every ten minutes is 576 a day, three is 432. They are what the resource costs before a change, a retry, an approval wait or a post-Apply proof adds anything.

Raising spec.interval divides all of it. A resource whose artifact changes once a week and whose database nothing else writes does not need a reading every ten minutes, and the interval is the first thing to move on a large installation.

One manager reconciles, whatever the replica count. Additional replicas serve admission and take over on failure; they do not divide the reconciliation work, because a single leader holds it.

The chart’s defaults for that manager:

Request Limit
CPU 50m —
Memory 96Mi 256Mi

Those are defaults, not a measured working set. The manager caches the live status of every resource it watches, the Jobs it dispatched and the policy objects it reads, so the number that matters is the one your resource count produces, and nothing here establishes it.

A plan is immutable, and a new fingerprint publishes a new one. Nothing is pruned automatically.

Value
Maximum executable plan 8 MiB
Chunk size 512 KiB

A hundred distinct retained plans at that ceiling hold eight hundred mebibytes of SQL before metadata. That is arithmetic about the limit rather than a measurement of any installation. Which plans may be deleted is Pruning stored plans.

The dimensions an envelope has to be stated over

Section titled “The dimensions an envelope has to be stated over”

A measured envelope is a set of numbers against a workload, and these are the axes that workload varies along. They are named here because a measurement that holds one of them fixed says nothing about an installation that moves it, and because the reader sizing an installation needs to know which of their own numbers matter.

Dimension Why it changes the answer
Resources, and realms across them Every resource refreshes on its own interval; resources sharing a database realm serialize against each other, and resources in separate realms do not
spec.interval The cadence above multiplies by resource count, and it is the first thing to move on a large installation
Plan size A plan is stored as chunks up to the 8 MiB ceiling, and an applied plan once more as the ConfigMaps its Apply mounts, so it costs API bytes, etcd, and a longer read on the way back
Migration history length History is read on every refresh of a PtahMigration, and the reading grows with the sequence already applied
Approvals waiting A resource waiting for a person keeps refreshing and keeps its plan and its chunks, so a backlog is retained storage as well as queue
Changes at once A rollout, or a restart, refreshes everything at once; the burst is what a steady-state figure does not describe

None of these has a supported maximum, because none has been measured. What follows is what a measurement would have to produce for them.

hack/capacity measures a declared workload on the demonstration lab, which is the acceptance harness stopped after its bootstrap, so what it measures is the chart and images of the commit it runs from:

Terminal window
make demo-up
CAPACITY_OUT_DIR=/tmp/capacity hack/capacity.sh

The default workload selects PostgreSQL. To measure MySQL on the same lab, use a fresh output directory and the MySQL workload:

Terminal window
CAPACITY_WORKLOAD=support/capacity/workload-mysql.json \
CAPACITY_OUT_DIR=/tmp/capacity-mysql hack/capacity.sh

The manual Capacity workflow also accepts an engine selection. Each run measures one engine and records it in the report; a PostgreSQL result supplies no MySQL measurement.

support/capacity/workload.json declares the workload: how many resources of each family, their interval, how long each condition lasts, how many resources change at once, and how long the registry is unreachable. The harness gives every resource a database of its own, so no two share a realm or an advisory lock, and walks the workload through a cold start, a steady state, a restart of every manager at once, a batch of changes and a registry outage.

The Go collector accepts -namespace work-a,work-b when both namespaces have been prepared. It distributes each resource family round-robin, so ten schemas and ten migrations produce five of each in each namespace. Each namespace needs the declared registry credentials, verification policies, image-pull configuration and the database Secrets for its assigned resources. Resource index i goes to namespace i % namespaceCount within each family; database Secret indices remain global, with migrations following schemas. The extra restart-approval fixture stays in the first namespace. The lab wrapper prepares two fresh workload namespaces with the profile’s object quotas and restricted Pod Security Admission pinned to the server minor. It copies the lab’s registry credentials and immutable verification policies into each namespace, and gives their default ServiceAccounts pull credentials without API write grants or automatic token mounting.

On a cluster with enforced egress, set CAPACITY_REGISTRY_EGRESS_POLICIES=ptah-schema-operations-registry,ptah-migration-operations-registry to name the registry-only allowances from the network-policy example in every workload namespace. The collector’s equivalent is -registry-egress-policies. The outage temporarily withdraws those allowances and restores their original rules, preserving DNS, database, and result-delivery policies. Recovery refuses to overwrite a replaced or concurrently edited policy. An interrupted process that cannot run cleanup requires restoring the named policies before another run. The IP-based fault is limited to the unrestricted HTTP lab: additive policies cannot override an existing allowance, and an HTTP backend address does not identify the TLS proxy. The collector checks this configuration before creating the fleet. A timed hold still passes only after fresh registry-read failures have been observed in both resource families in every workload namespace.

The restart scenario requires a fresh approval, its exact Apply Job, and a fresh converged History reading for the approved migration. It watches the claim from before admission and checks the migration, plan, approval, and Job UIDs. Missing admission, a broken watch, an unrelated Job, or incomplete recovery fails the run even when the rest of the workload converges. An ambiguous create response followed by an existing approval is inconclusive and fails the measurement.

The selected database server runs in a separate fixture namespace. Every workload database has its own login. PostgreSQL owners have no superuser, role creation, database creation, replication or row-security bypass privileges, and public database access is revoked. MySQL users receive privileges on their own database only, without global privileges or grant options. Their database names contain no wildcard characters. Database credentials travel through stdin and Secrets; the ownership journal contains no passwords. NetworkPolicies refuse inbound traffic to task Pods and admit database traffic only from the workload namespaces.

The wrapper records created namespace UIDs in bootstrap-state.json inside a fresh output directory. Cleanup uses those UIDs and waits for workload namespace deletion before removing the database; it never forces finalizers. If cleanup fails, it reports the retained fixtures and journal. With the same lab environment loaded, retry it with python3 support/qualification/probes/capacity_bootstrap.py cleanup --state /path/to/bootstrap-state.json.

This bootstrap remains a lab configuration. Verified TLS, signed artifacts, the full egress profile, the declared artifact/history/data sizes and the complete soak remain required for 0.2.0 qualification.

Samples aggregate workload reads across every declared namespace and mark the source incomplete if any read fails. Jobs retain their namespace and UID, cycle watches run separately for each namespace and family, and artifact updates address the resource’s declared namespace. A right resource count in the wrong namespace does not satisfy convergence.

The outage must produce a failed Resolve in each loaded resource family in each occupied namespace. The report retains each failure’s Pod UID and runner frame digest. Only a Pod created after the fault, with a matching operation ID and a read-only child_exit result, counts. A NetworkPolicy that blocks nothing fails this check. Removing the policy starts the recovery clock; every workload resource must then converge with a fresh database observation. Each created policy is also removed if measurement fails, with its UID checked before deletion. A failure in the second namespace still restores the first; an existing policy that prevented creation is never removed by that cleanup.

Throughout, it reads the cluster rather than estimating it:

Figure Read from
Jobs per minute, time to start and to finish Each operation Job’s own timestamps
Pending and running operation Pods The Pods, by phase
Oldest reading and time overdue Each resource’s lastObservedAt or history.observedAt, and its nextReconciliationTime
Manager memory and CPU Each manager Pod’s process_resident_memory_bytes and process_cpu_seconds_total
Queue depth and wait workqueue_depth and workqueue_queue_duration_seconds
Client throttling rest_client_rate_limiter_duration_seconds and HTTP 429 responses
Admission latency Each API server’s own apiserver_admission_webhook_admission_duration_seconds for this operator’s webhooks
Retained plans and SQL The plan objects, the bytes in their chunks, and the ConfigMaps each applied plan was projected into
Time to serve an approval during a restart The approval’s admission and its Apply Job’s creation

The report carries the workload and the environment beside the figures: the Kubernetes version, the nodes’ allocatable CPU and memory, and the manager’s image and resources. The lab wrapper also records the Docker daemon’s CPU and memory once, with its identity and timestamp in host.json. Kind nodes share that host: their summed allocatable resources are scheduling capacity, not additional physical CPU or memory. A direct collector run without -host-info marks host capacity unobserved. Neither reading establishes exclusive use of the machine. A figure without its environment says nothing about another installation. The Capacity workflow runs the same thing on a schedule, on request, and on any change to the measurement itself, and publishes the report as an artifact of the run.

Report format 3 records failed reads in each sample’s incomplete list and counts them by source in each scenario. Figures affected by a failed read are null in JSON and n/a in the summary, including a maximum that was only partly observed. Missing manager process metrics and a window with no samples are also missing evidence. A fault may explain a missing reading, but the report cannot establish a performance bound for that figure during that window.

Each complete sample retains the queue-wait and admission histograms, including observation counts, sums and cumulative buckets. Recomputing a scenario from these samples preserves its histogram percentiles. Bucket upper bounds and percentiles above the largest finite bucket use the JSON string "+Inf"; finite values remain numbers. The summary displays this as > largest bucket. Reports written before format 3 lack these raw histograms and cannot establish their histogram percentiles from the retained samples alone.

Manager samples retain the Pod UID, container ID and start time, restart count, and process start time. The sampler checks the container identity again after each scrape. -expected-managers declares the required population and defaults to two. The sampler checks the full Pod inventory before and after collection. A missing or extra replica, a terminating Pod, a missing identity or a replacement during collection makes the manager reading incomplete, including when a replica is absent from the first sample.

Scenario counter deltas require at least two ordered readings, the same manager processes throughout, and no reset in any intermediate counter or histogram. A replacement, missing replica or counter reset adds manager-counter-continuity to the scenario’s incomplete counts and records its reason in counterProblems. CPU, client throttling, HTTP 429 counts and queue-wait percentiles then become null/n/a; complete RSS and queue-depth readings remain available. A planned restart explains this gap but does not supply the missing counter measurements.

The sampler requires one running kube-apiserver Pod per control-plane node. -expected-api-servers declares the count and defaults to three for the 0.2.0 profile. Each collection checks the node and Pod inventory before and after scraping. It opens a bounded Pod-specific port-forward to port 6443 and uses HTTPS with the kubeconfig’s cluster CA, client credentials and kubernetes.default.svc certificate name. Insecure TLS and redirects are refused. The lab identity needs node and Pod reads, Pod port-forward access in kube-system, and get /metrics; the sampler creates no RBAC grants.

Each sample’s apiTargets retains the declared node and container identities. apiServers holds separate process identities, scrape timestamps, admission histograms and API priority/fairness rejection counters. Each scenario reports admission percentiles, population size and time boundaries per server. A missing member, identity change or counter reset makes the affected scenario figures incomplete; apiCounterProblems records continuity failures. The summary lists every server and its observation count. An empty population is n/a, and fewer than 20 admission observations cannot meet the qualification’s percentile requirement. API priority/fairness rejections count all traffic; attribution to workload, monitoring and fixtures needs separate evidence.

The collector also lists and watches the workload’s PtahSchema and PtahMigration resources before creating them. Its identity needs list and watch on both kinds in the workload namespace. Watch reconnects resume the last resource version. An expired cursor, failed watch or full event buffer stops the workload and makes the cycle count incomplete; a new list cannot replace missing history.

The report’s cycles section retains compact readings, resource lifetimes and completed read-only cycles. A cycle requires Resolve/Verify/Observe/Plan for a schema, or Resolve/Verify/History for a migration, with distinct bound Job UIDs and fresh convergence for the same resource UID and generation. Initial status, Apply, unresolved runs and repeated completion readings do not count. A pending lock release must clear before a cycle counts. Condition messages are omitted.

Each scenario’s refreshCycles lists counts per resource UID, including zero. A replacement starts its own count, and a cycle crossing a scenario boundary is excluded. The final convergence reading must arrive before the window ends; an older observation timestamp cannot move a later lock release into that window. A history gap makes this field null and records cycleProblems. These observed cycles are not estimates from elapsed intervals or Job totals. They do not yet establish the qualification profile’s churn, per-slot minimum or full soak.

The soak workload also sets unrelatedObjects: true. Before the cold start, the bootstrap creates 1,000 immutable ConfigMaps with 1 KiB payloads and 1,000 Jobs across two additional namespaces. At most twenty of these Jobs run at once during preparation. Each runs a non-root, read-only shell that exits successfully. No service account token is mounted; a NetworkPolicy denies ingress and egress in each namespace. Completed Jobs and their Pods remain present during measurement. They carry a separate label and live outside the workload namespaces, so they affect the cluster without entering workload Job or Pod counts.

The bootstrap checks the full population, original UIDs, ConfigMap bytes, Job completion, and each matching Pod’s successful execution before and after the workload. The raw inventories and their hashes accompany the ownership journal. Cleanup deletes these namespaces with their recorded UIDs, using the same cleanup path as the workload fixtures. This fixture supplies the declared background population; its presence alone does not establish performance.

Each sample retains the UID, resource version, generation, suspension/deletion state, read time, active operation claim, and database observation and reconciliation timestamps of every workload resource. The report keeps its original maxima across all resources and separately computes eligibleFreshness for resources that are neither suspended nor deleting. Waiting for approval does not exclude a resource: it still refreshes. Missing timestamps, partial lists, and older reports without these per-resource readings cannot establish an eligible freshness bound; the affected values remain null (n/a in the summary). Freshness belongs to the scenario in which its resource list was read, even when collection began in an earlier scenario. Each resource collection records its start and finish, including failed attempts. The report counts readings excluded from a boundary-crossing sample as outsideWindowReadings; a partial or failed list cannot become a complete population by filtering its timestamps.

Claiming an operation clears its scheduled reconciliation timestamp. A valid persisted claim without that timestamp counts as in flight, and its age is reported separately. It remains eligible for observation age: a long-running operation cannot hide stale database observations. A phase name alone cannot establish a claim. A missing deadline without a claim remains unavailable, and a population with no scheduled readings has no scheduled overdue bound. Recovery can retain both a claim and a deadline; those readings contribute to both counts, and their actual deadline still determines scheduled overdue.

The full workload and 90-minute soak remain required for 0.2.0 qualification. A successful metrics collection does not establish a capacity bound.

The native profile lab sends the collector’s requests through the cluster’s API load balancer. Each Ptah resource write closes its connection afterward, so the next write can reach another API server and supply an admission sample there. The request, actor, CA verification, and workload stay the same. Reads and watches retain connection reuse. This applies to the test client; manager connections keep their installed behavior. The report records the test client’s write-connection policy, and admission percentiles still require at least 20 observations on each API server in the measured window.

Repeated updates and retention maintenance

Section titled “Repeated updates and retention maintenance”

CAPACITY_VARIED_INPUTS=1 CAPACITY_WORKLOAD=support/capacity/soak.json selects the populated 90-minute workload. Each ten-minute round updates five resources of each family, replaces two idle resources of each family, and checks the databases before and after those changes.

The round then exports retained plans and suspends all twenty resources. Each pass suspends every idle resource before waiting for busy resources or retrying conflicting writes. Requests remain sequential, so one busy resource does not extend its peers’ suspension by holding the rest of the fleet behind it. It waits for the controllers to acknowledge suspension and for every workload Job and Pod to finish. Managers remain running. Before each obsolete-plan deletion, the collector re-reads every documented retention pin, including the unresolved migration record’s metadata copy, and verifies the exported bytes. Deletions carry the plan UID and resource version. The collector waits for the plan and its owned chunks and projections to disappear, verifies pinned plans again, then resumes the resources and checks convergence and database contents.

The report records the before/after inventories, archive hashes, exact deleted identities, garbage collection results and a complete post-cleanup metric sample. The final three checkpoints require non-growing retained payload within 128 MiB and the same manager processes, each within 192 MiB RSS and 10% of its first checkpoint. Missing measurements and broken process continuity fail the comparison. A shorter diagnostic with fewer than three rounds cannot establish that plateau.

After the measured soak, soak.retentionFault exercises pending approval and unresolved Apply on the same twenty resource identities. Native Ptah rolls back one fixture migration, and the probe drops one empty schema payload table. Before approval, it changes the schema’s lock timeout under Never, then restores the original policy. This produces an actual superseded plan whose deletion and garbage collection the fault must prove. A temporary admission policy prevents one schema’s Apply claim from being saved; the collector requires the actual refusal before suspending that resource with its admitted approval still pending. A thirty-second database table lock holds the migration’s native Apply while the collector suspends that migration. The controller records its uncertain outcome and retains the metadata copy.

With the fleet suspended, the collector exports the plans, prunes only unpinned plans, and verifies both fault subjects and their payloads before and after garbage collection. It then removes its admission gate, resumes the fleet, records whether the retained schema approval was consumed or retired by the fresh read. A retired approval stays retained, and recovery uses a new admitted approval bound to the current plan. The collector also requires fresh migration history to settle the unresolved run without another Apply. Complete database inventories check that all rows, defaults and migration versions are restored. These deliberately blocked resources are outside the measured soak window. A failure preserves the evidence and attempts to remove the owned gate and resume the exact resources it suspended.

For a focused local retry, the collector accepts -retention-fault-baseline <prior-after-prune.json>. Restore the failed fixture through ordinary reconciliation first. Use a fresh output directory and a copy of the original input bundle with a fresh checkpoint directory. The collector requires exactly the baseline’s twenty UIDs, their resumed specs and current artifact references; it refuses replacements, changed targets and additional workload resources. Its report declares retention-fault-only. Keep the owned lab and fixture journal until the retry finishes, then run the original cleanup. This mode reuses preparation and does not repeat the soak.

After the registry outage, databaseDelay holds every new database session for thirty seconds over a five-minute window. The collector points the database Service at a proxy from the lab’s fixture image, which accepts each connection and reaches the database only after the delay; sessions already open keep their route. It creates no object in the databases the operator manages, because a function or trigger there would be schema the operator plans to remove. Each family in each namespace needs one fresh database operation the delay reached: one that failed without starting a mutation, or one whose Ptah container ran at least the delay. The proxy’s own log must show every session it connected was held for the delay. The collector then restores the Service selector it moved, drains and removes the proxy, and measures fresh convergence from the restore. soak-mysql.json runs the same workload on MySQL.

The full qualified execution matrix remains required by the frozen profile.

The Capacity workflow ran the lab-20 workload on 2026-09-26, run 36204346798: ten PtahSchema and ten PtahMigration resources, each on a database of its own, at an interval of two minutes. The report is kept in full in support/capacity/readings/lab-20-2026-09-26.json.

It ran on Kubernetes v1.37.0 in kind, with two manager replicas requesting 50m of CPU and limited to 256 MiB. The report records 16 allocatable CPUs and 62 GiB across four nodes, which is one 4-CPU, 16 GiB runner counted four times: every kind node reports the machine it runs on.

Scenario Seconds Jobs/min avg (peak) Job done p50/p95 s Pending Pods max Oldest reading s Overdue s Manager RSS MiB Manager cores Queue wait p95 s Throttled s Admission p95 s Outcome
cold start 113 63.9 (64) 11 / 19 12 50 0 64 0.16 <= 10 0.0 <= 0.5 converged in 1m52s
steady state 900 27.9 (52) 6 / 10 7 154 0 77 0.06 <= 1 0.0 <= 0.1
restart burst 146 26.0 (42) 6 / 11 5 170 10 77 0.06 <= 1 0.0 <= 0.5 approval admitted in 22s, dispatched in 26s, converged in 1m59s
change batch 142 41.4 (59) 8 / 17 10 154 0 81 0.12 <= 1 0.0 <= 0.5 10 resources moved, converged in 2m22s
registry outage 180 15.3 (25) 65 / 71 2 268 42 75 0.03 <= 0.1 0.0 <= 0.1
recovery 55 50.1 (44) 14 / 24 17 313 2 75 0.13 <= 1 0.0 <= 0.5 converged in 55s

Across the run the plan store grew from nothing to 31 plans and 15 chunk ConfigMaps holding 11,330 bytes of plan; chunks were ConfigMaps when this was measured, and are PtahSchemaPlanChunk objects now. Small schemas make small plans, and a real schema’s plans are larger by as much as its SQL is.

What it shows is the shape of each figure and how the tool reads it. The steady state ran about 28 Jobs a minute for twenty resources at two minutes, below the 35 that four and three operations every two minutes would give, so the cadence arithmetic above is an upper bound rather than a prediction. A restart of both managers put nothing behind by more than ten seconds and admitted an approval in the middle of it within 22. The registry outage is the one scenario that slowed anything, and it slowed the operations that need the registry, which is what it is for. Nothing waited on client throttling.

What it does not show is any installation’s limit. Twenty resources on one runner measure the operator well inside what the machine could give it; the figures that decide a budget are where these curves bend, and this workload never reached one.

The acceptance record carries these figures in one place, as the operating targets and recovery objectives of a profile scoped to this lab: support/acceptance/lab-20.json, which make acceptance-record ACCEPTANCE_PROFILE=support/acceptance/lab-20.json reads. It says the lab restores no database and claims no recovery point or time for one. A test rebuilds its text from the report above, so the profile and the reading cannot disagree.

Everything that decides whether an installation is inside its budget, at that installation’s scale:

  • reconciliation lag and queue delay at a given resource count;
  • Job creation rate and completion latency under a simultaneous refresh after a restart, which is the burst every installation gets on every rollout;
  • manager CPU and resident memory against a named workload;
  • API throttling and admission latency;
  • fairness across independent database realms, and the time to reach safety-critical work while ordinary work is queued;
  • behavior beyond the admitted limits: whether it degrades or refuses.

The reading above is one workload on one runner; it bounds none of these for anyone else. An installation that needs a number for any of them has to measure it. Saying so is more useful than a figure nobody produced.

Run CAPACITY_VARIED_INPUTS=1 CAPACITY_WORKLOAD=support/capacity/backlog.json with hack/capacity.sh to measure approval waiting and execution separately. The scenario starts with twenty populated resources. It changes five resources of each family to their next artifacts and OnApproval in the same update, keeps every resource UID, and waits a complete configured refresh interval. Database checkpoints must still show the original schema defaults, row digests, and migration histories before any approval is submitted.

Each approval binds the current resource and plan in that resource’s namespace. The five-minute execution budget begins at the earlier of the first approval’s admission stamp and API creation timestamp and includes the final database verification. The report retains consumed approvals, successful Apply Jobs, plans and payloads, and continuous watch history through the final resource versions. Missing bindings, an Apply before its approval, a second Apply claim, a replaced resource, or an incomplete watch prevents success. Waiting is reported separately from execution.

This workload adds the declared unrelated-object population by default. Its implementation and unit tests do not establish a backlog capacity result; that requires a completed run and comparison with the frozen profile’s thresholds.

backlog-mysql.json runs the same backlog on MySQL.

CAPACITY_WORKLOAD=support/capacity/overload.json runs forty resources at once, twice the admitted twenty, holds them for ten minutes, and then retires the upper half of each family. It measures behavior outside the profile, not a larger admitted capacity. Excess concurrency may queue and refuse; the report keeps the peak running and pending operation Pods with every other measurement. The run fails if a manager restarts or is OOM killed, if any resource carries an unresolved Apply, if one resource is applied twice, or if the twenty that remain do not reach fresh convergence within five minutes of the return. Each retired resource is idle and converged when deleted, its plans are exported first, and the delete carries the UID and resource version that export read. overload-mysql.json runs it on MySQL.

The plan beyond the 8 MiB executable limit is the data-plane suite’s native-plan-size-boundary row. It proves both engines’ size limits, and the refusal of a larger plan, on every supported minor and architecture.